Don t allow your crew to walk on i joists or install subfloor sheathing until all hangers blocking panels and temporary safety bracing strapping are fully installed.
Floor joist braces ducts.
Sometimes the best route for a flexible duct run is up and over an obstruction.
One bedroom is 12x10 the other 10x10 i ve decided to use oval duct to go underneath the cross bracing that would be dead center of the living room.
While most residential construction uses 2x8 joists with 16 inch spacing there are many other factors you need to consider when determining the proper joist span length.
Walking on joists before all accessories and floor decking are installed i joists are unstable and can roll over if walked on leading to injuries.
Cross bracing and solid blocking.
To prevent problems use saddles or straps to support at regular intervals 4c 4d follow the manufacturer s instructions but in case they get lost here is a list of best practices for.
Duct work is mostly 8 round but going to get some oval.
Position bathroom vent fans so the ducts can run parallel to the joists right up to where they exit the house.
Figure 4 2 x 4 installed below duct work table 1 provides the correct quantity of bridging relative to the span of the floor joist.
Funny i am in the middle of writing an article on this very thing.
Floor joists are 2x10s the floor appears to be fullly nailed down solid 3 4 planks.
Finally if all else fails drop your pipes and ducts down below the joists and box them in with wood framed.
I did an audit on a house the other day and they have several of them.
Joist span and spacing is set by your local building code.
Whether your home is new or old it is sometimes necessary to install floor joist bracing in order to eliminate squeaking and deflection in the flooring itself.
When building a house or even a deck it is important to confirm you have the correct joist sizes spans and spacing before you get started.
House is 1959 original floors.
But without proper support ducts can develops sags or kinks that reduce airflow 4a 4b.
Although not as good as solid or cross bridging a 2 x 4 supporting the duct work as shown in figure 4 would provide more support and load sharing than a light piece of metal.