Add about 10 to that number to account for any possible mistakes and warped boards.
Floor prep needed for laminate flooring.
This allows the floor to move.
The key to a beautiful long lasting hardwood or laminate floor is a well prepared subfloor.
This can cause some floor preparation.
Remove any carpet or other flooring.
Measure and cut 1 4 inch or thicker plywood with a circular saw to fit the entire floor of the room where you are installing vinyl flooring.
Some laminate flooring products need to be acclimated to the room for several days before installation.
You ll need a table saw floor spacers and a rubber mallet to lay laminate flooring.
Preparing for a laminate flooring installation once you ve confirmed that you have a suitable laminate flooring subfloor you will need to prepare your subfloor for installation.
Determine how much flooring and materials will be needed.
The low price the large variety of colors and textures high quality durability and easy maintenance make laminate flooring a great choice.
Undercut door trims and door jambs.
If you can slide the floor underneath the wall a little do so.
Do this by multiplying the room s length by its width.
Check the height of the new floor against all doors that open into the room as it may be necessary to trim the door to accommodate the change in the floor s height.
Before you install your plywood subfloor first calculate the room s square footage to find out how much flooring you ll need to buy.
Before you begin you need to ensure your sub floor is ready for install.
Whether you have a plywood subfloor or a concrete subfloor there are a few steps that are universal in preparing the subfloor.
Laminate flooring is ready to install as long as the base floor is clean and smooth.
The goal is to have a wooden subfloor consisting of two.
At this point with the concrete floor exposed you need to make sure the floor is somewhat flat.
Use a piece of flooring and underlayment as a guide and mark the door trim and jamb for trimming.
Multiply length times width of the room.
After removing the existing flooring baseboards and quarter moulding check that the subfloor is solid flat and clean.
If there are humps in the floor you will have to either raise the area surrounding the hump or get rid of the hump.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Lay the first row of boards so that the groove faces in toward the interior of the room measuring and cutting the length of the final board in the row.