Is the combination of roof sheathing gypsum wallboard on the ceiling and a hurricane clip on one side of a truss an acceptable substitution for solid blocking.
Floor truss blocking.
For example if you have.
When the 4x4 block length is extended this is referred to as mid chord bearing.
Along the wall at the top of your photo simply cut blocks that fit snugly between the trusses and toenail them in place.
The multiple bearing conditions make matching existing floor heights much easier when using floor trusses.
This allows you to find the distance in lumber you need to cut.
Toenail them once that s done.
A set of plans and specifications will often provide the lateral load the blocking must resist and specify that the truss supplier design the blocking to resist that load.
Parallel chord roof trusses and energy heel trusses often exceed a 15 heel height and have need for this more elaborate method of blocking.
Blocks blocking panels and structural panels plywood osb are all acceptable.
Floor trusses offer four different bearing conditions for a wider variety of uses.
I joists offer only one bearing condition.
Top chord bearinga floor truss support condition in which the truss load is transferred to the bearing or support through the top chord and 4x4 block end detail.
Bottom chord bearing bottom chord bearing trimmable ends top chord bearing and mid block bearing are all available.
Cut the lumber to fit between the two joists.
These are the steps to take to install blocking.
Hammer your nails.
Measure the length between the two joists.
Truss a pre built component that functions as a structural support member.